Turnkey engineering, procurement and construction services with single-point accountability — from design and procurement to construction and handover.
As an EPC contractor, Palvam Projects brings together architecture, engineering, procurement and on-site construction under one integrated program. This approach reduces risk, improves schedule certainty, and gives you a single accountable partner for quality, cost and time.
Our EPC model bundles design, procurement, construction and commissioning into a single contract. We tailor the scope to your project but typically include:
One contract, one schedule and one team — we manage interfaces so you don’t have to reconcile multiple vendors.
Transparent tendering, competitive sourcing and materials QA to optimise cost without compromising quality.
Robust CPM scheduling, milestone monitoring and proactive vendor management to adhere to agreed timelines.
We begin with a clear brief and feasibility analysis. We review site constraints, confirm scope, and prepare an initial schedule and budget estimate. This phase includes:
We advance the approved concept into coordinated construction documents. This includes structural calculations, MEP drawings, and shop drawings required for procurement and construction.
We run competitive tenders or use pre-qualified suppliers to source materials and equipment. Logistics and quality inspection are handled centrally to prevent site delays.
Our site team manages civil works, MEP installation and finishing with safety-first supervision, daily reporting and stringent quality checks.
We conduct system checks, performance testing, and snag resolution. Then we hand over as-built drawings, O&M manuals, and warranties for your project.
We work with pre-qualified vendors and evaluate based on delivery capacity, quality certifications, track record and price. For specialised equipment we shortlist multiple suppliers to ensure competitiveness.
Incoming material verification, sample testing, third-party inspections for critical elements and on-site QA checkpoints ensure materials match specified standards.
We maintain an itemized procurement ledger and provide periodic cost reports to demonstrate how funds are used and where optimisations were applied.
Centralised receiving and secure storage reduce damage and loss. Critical long-lead items are flagged early to prevent schedule slippage.
Project timelines vary by scope. Typical EPC projects for residential/commercial builds follow this pattern:
Speak with our EPC team to review scope, timelines and a transparent cost plan tailored to your requirement.
Request EPC Consultation